ROADWAY REHABILITATION ON THE ODŽACI-KARAVUKOVO SECTION

For the investor PE Putevi Srbije, at the end of 2019, we conducted roadway rehabilitation works on the L 410 road from Odžaci to Karavukovo.  The length of the section involved in the third phase of reconstruction and rehabilitation works is 5.6 km. Before the construction of final asphalt layers, degraded surfaces were repaired and cracked asphalt surfaces on the existing roadway structure were removed. The previous two phases of works were conducted in Karavukovo, while the mentioned third phase involved the works between towns Odžaci and Karavukovo, which is the access road to border crossing "Bogojevo".